Pages

Sunday, 6 March 2016

Dreamland Legal Advice My FOI Appeal

My previous post explained that I have been trying to get hold of a document produced 18 months ago by Thanet Council's solicitors Towers and Hamlins about alleged irregularities in the selection of  the operator of the £18million Dreamland  Amusement Park at Margate. So concerned was Thanet Council about these allegations that it decided, on the basis of its legal advice, to take the quite extraordinary step of disallowing Sands Heritage Limited second application to become the Dreamland operator (there were 2 separate  selection processes) and only considering its initial application. I tried to secure a copy of the Towers and Hamlins report via a Freedom of Information request but my request was, unsurprisingly, rejected by the notoriously secretive and cover-up loving Thanet Council.

I publish below my letter to Thanet Council seeking an internal review of their decision. If you can think of any reasons I can to add to this letter please let my know - as Tesco's says every little helps!. Having said that I suspect that even if I was to write the most convincing letter in the world, Thanet Council would still reject it. Which means that I will eventually have to appeal to the Information Commissioner to have the document disclosed. However, I think the wait will be worth it as I believe that the publication of the Towers and Hamlins legal advice may well reveal some embarrassing facts about how our  then Labour council leaders and  senior officers managed this multi-£million flagship project which you paid for.
  
 
Dear Thanet Council
Further to your e-mail of 2 March 2016 concerning my FOI request (Ref 85485/3252604) I disagree with your decision, taken under section 42 of the Freedom of Information Act (legal professional privilege), to refuse my request for a copy of the Towers and Hamlin's legal advice related to the Sands Heritage application to become the operator of the Margate Dreamland Amusement Park.

I would like you to conduct an internal review of your decision. I set out my reasons why you should let me have the document I have requested below.

1.   Timing of Disclosure. The Towers and Hamlin's legal advice was procured by Thanet Council sometime during the summer/ autumn of 2014. In October 2014. Following receipt of this advice Thanet Council selected  Sands Heritage as its preferred candidate to operate the Dreamland Amusement Park.

In its published guidance on section 42 exemption the Information Commissioners Office (ICO) sates that  “Where legal advice has served its purpose, litigation has ended or the possibility of litigation has ended the public authority may be more inclined to disclosure.”  The fact that Sands Heritage was selected by the Council as the Dreamland  park operator almost two years ago and the fact that the Trowers and Hamlins legal advice was an important factor in making that decision, demonstrates that the advice has served its purpose. This fact should have caused Thanet Council to be more “inclined to disclosure” of the  Trowers and Hamlins legal advice. This does not appear to have been the case.

 
2.   Public Interest.

A)    Transparency.  The ICO states that there  is a general public interest in the promotion of transparency so as to demonstrate good decision making by public bodies. I would argue that, in this case, the duty to be transparent is much more important than usual. The Dreamland project was (and remains)  one of the largest projects undertaken by Thanet Council and is key to the regeneration of the district. Over the past 3 years there has been massive coverage of Dreamland  in the local, regional and national media and social media also. This is a project which is well known, particularly to most people living in the Thanet area, most of whom will have an interest in knowing whether the Council made good and effective decisions in its management of the project.

 
B)   Wrongdoing.  The ICO states that the suspicion of wrongdoing (not specifically criminal wrongdoing), is an important reason why information, including privileged information, should be released, particularly if this information helps to shed light on the alleged wrongdoing.

My understanding is that the Trowers and Hamlins legal advice was procured by Thanet Council specifically because concerns had been expressed about  Sands Heritage Limited  application to become the Dreamland Park Operator and that these concerns may have included allegations of wrongdoing.  For the Council to have commissioned the production of expensive legal advice can only mean that it felt that the concerns about Sands Heritage were plausible, although not proven. The disclosure of the Trowers and Hamlins legal advice will shed light on any potential wrongdoing and will demonstrate how effectively, or otherwise, Thanet Council managed these concerns.
 

C)   Resources and Money The ICO allows for the use of resources and money to be taken into account when assessing the strength of a public interest disclosure argument. In the case of the Dreamland project at least £8 million (possibly more) of council tax payers money has already  been invested in this project. An equal amount from the Heritage Lottery Fund and the Government Sea Change grant scheme which, to all intents and purposes,  is public money has also been invested in the project. Finally, compensation for the compulsory purchase of the Dreamland site has not yet been agreed with the former owners. It is speculated that this compensation could exceed £1 million which will have to be paid for by the council tax payers of Thanet.

Bearing in mind the massive amount of public money expended to date on developing and opening the Dreamland Amusement Park, the public have an extremely powerful interest in  knowing  if this money was spent wisely and effectively. This is particularly relevant to perhaps the most important decision of this project – the appointment of the Dreamland operator – Sands Heritage – and whether this decision was a wise decision. The disclosure of the Trowers and Hamlins legal advice would be absolutely critical in answering this question.

Furthermore, the fact that Sands Heritage narrowly avoided bankruptcy and was forced to enter into a £2.9 million Company Voluntary Arrangement with its creditors in December 2015, raises many questions about Thanet Council’s decision to appoint this company to be the Dreamland Operator and whether this decision represented best value for money. The disclosure of the Trowers and Hamlins legal advice would be absolutely critical in answering this question.
 

D)   Fair Treatment and Commercial Competition  I understand, although I do not know for a fact, that the concerns which led to Thanet Council securing legal advice  from Trowers and Hamlins  included allegations  that Sands Heritage may have enjoyed an unfair commercial advantage over its  competitors in its application to become  Dreamland Operator. The ICO specifically allows, as a reason for public interest disclosure, the publication of documents which demonstrate whether or not a public body has promoted and encouraged fairness and competition during a procurement process.  The disclosure of the Trowers and Hamlins legal advice would be absolutely critical in answering this question.
 

On the basis of the arguments I have set out above, I do not believe that Thanet Council has any lawful reasons to continue withholding the Trowers and Hamlins legal advice from me. I look forward to hearing from you.

Friday, 4 March 2016

Dreamland Operator Selection: A Bite on the Arse?

Not only was the Heritage Lottery Fund concerned about the appointment of Sands Heritage Ltd as the Dreamland operator but, according to rumours  I have heard,  so were others. From what I can gather these concerns were focused on Thanet Council’s management of the operator selection process. I understand that formal complaints may have been made to Thanet Council about its handling of the park operator procurement process and that there may even have been the threat of legal action related to the tendering process.  These rumours certainly appear to have substance.

In May 2015, Larissa Reed of Thanet Council produced a  report headed “Restricted – commercially sensitive information”  in which she described how Thanet Council managed the Dreamland Operator procurement process. It explains that 2 efforts were made by Thanet Council to secure an operator. The first effort in,  June 2014, resulted in only one application being submitted by Sands Heritage. On advice, it was  “determined that the council should re-advertise the offer”.

The second procurement effort  was launched in September 2014. This time there were 6 returned  applications including Sands Heritage and the Dreamland Trust. But here’s where things, even by my standards, get a little odd. Because the report  says that whilst all 6 applicants, including Sands Heritage,   provided tender submissions “following legal advice from Trowers and Hamlins we agreed to consider the previous tender submission from Sands Heritage Limited”. So if my understanding is correct this means that on the basis of legal advice Thanet Council decided to reject Sands Heritage’s tender submission for the second bidding round  of September 2014 and only consider its original submission from the first round of tendering in June 2014. Why was this?

Clearly, Thanet Council and its lawyers must have had some extremely serious concerns about the probity of the second Sands Heritage   tender submission. Serious enough to have  decided that it would have  been inappropriate to consider its second tender document. My educated guess, and I stress the word guess, is that these concerns were the result of the alleged complaints and possible threats of legal action made to the Thanet Council which I have already mentioned. What the substances of these complaints and threats of legal action were I do not know. However in the interest of open and transparent Government I intend to find out and to make my findings public.

4 weeks ago I submitted a Freedom of Information Request to Thanet Council asking for a copy of the Trowers and Hamlins legal advice.  As I expected I was given the bums rush. Writing to me yesterday, Tim Howes, TDCs Director of Corporate Governance said  “I can confirm that Thanet District Council holds this information” but “the Council consider that the advice from the Council’s solicitors to the Council is   exempt under section 42 of the Freedom of Information Act as the Council could claim legal professional privilege in respect of that information.” Fair do’s but the legal and professional privilege doesn’t mean the document remains under lock and key in the TDC offices for ever.

I have a right, which I will be exercising,  to appeal against Mr Howes decision through an internal review at TDC which takes 4 weeks. No matter how valid and lawful my arguments are for release of this document from the clutches of the secrecy loving Thanet Council, I am certain that, because of the sensitivity of Dreamland project and the fact that the reputations of so many council bosses and politicians   depend upon it not going pear-shaped, my appeal will not be successful. That will leave a final appeal to the Information Commissioner, which will take several months. Having read up on how to appeal against an  FOI rejection , I believe that in this case there are some very powerful reasons why the Trowers and  Hamlins report should be made public- so powerful I want to play a little game.

So the game is this. I will draft my letter requesting an internal review of Mr Howes decision
and publish that letter on this blogsite in a few day’s time. I will then ask for feedback and suggestions from you  as to how I can improve the letter and any technical and legal suggestions anyone may have to make it stronger. On the basis of feedback I will then produce a revised version of the letter which will be published on this website and sent to Mr Howes. I will the conduct a survey as to your view on whether Mr Howes will release the Trowers and  Hamlins report or not, which would be an excellent way of testing whether or not my view of Thanet Council as a secretive North Korean style organisation is a reasonable one.

In the run up to me  publishing the draft letter here are links to 2 guidance documents produced by the Information Commissioner which are relevant to my appeal and well worth reading



 Considering that Thanet Council tried, but miserably failed, to water down the Freedom of Information Act, (see my other posting about FOI) it would be most appropriate for an FOI collaboratively drafted by local residents to bite the out of touch corporate opponents of the Act on their municipal arse!!!

PS to cut the FOI process short I am happy to receive any information readers may have  about the Dreamland operator selection process. The usual confidentiality undertakings apply.  

Tuesday, 1 March 2016

Thanet Fees For Information Proposal Shafted

I was delighted to learn today  that the Freedom of Information Act (FOI) is still  alive and well and that efforts to undermine its  effectiveness and  scope have been defeated.

In its response to the report produced  by the Freedom of Information Commission , published on 1 March (1), the Government has announced  that it will accept the Commission’s recommendations and not introduce charges for FOI requests.  Nor will it make changes to the rules which allow charges to  be made for complex and time consuming FOI requests.  In addition, the Government intends to force public authorities   to publish, on a quarterly and  annual  basis,  detailed statistics on the number and nature of FOI requests received,  and to publish  more information about the pay and perks of senior staff(2).

You will probably recall that Thanet Council, despite UKIPs manifesto commitment to support the FOI system,  proposed to the Commission that   a  £25 charge for  every FOI request be imposed. This would have made it impossible for local campaigners such as myself and Louise Oldfield  to have exposed the incompetence, mismanagement and abuse of power by TDC and its then Labour councillors which  lay behind the Ramsgate Pleasurama and Margate Dreamland projects and the TransEuropa Ferries secret  £3.4 million debt scandal to name but a few. It would  have also stymied the efforts of  local and regional media to expose the serial wrongdoings and fuckups of what many believe to be the worst council in England - TDC.

Thankfully, TDC’s North Korean style democracy-dodging  proposal was totally at odds with the thinking of  the Commission and Government who both stated that  accountability, and transparency would be undermined if requests for information were  deterred by the imposition of fees.

This decision should be a clear signal to organisations like Thanet Council, and it’s accountability-avoiding councillors,  that their longstanding cultures of secrecy, cover-up and economy with the truth will not be tolerated and that they should be much more open to the public about their actions. Its hard to believe that for once I find myself on the side of the Conservative Government, what next? Supporting Iris Johnston or Chris Wells?  

Monday, 29 February 2016

Manston Airport: Labour's Aerobatic Stunts continued


The decision of Thanet Council's Labour group to support UKIP and Conservative plans to seek a partner to assist TDC's compulsory purchase (CPO) of the former Manston Airport is an act of unmitigated political stupidity which will have major consequences for the people of Thanet.

First there is the question of cost. Based on the abortive RiverOak debacle, its likely that Council Tax payers will have to foot a bill of somewhere in the region of £100,000 to pay for the work involved in securing a new CPO business partner. Considering the precarious nature of TDCs finances this is money which will have to be taken out of front line service budgets or paid for by further council tax rises next year. And for what? Many commentators, more legally knowledgeable than I, have already said that it is extremely unlikely that a CPO will succeed so why force the public to pay £100,000 for what appears to be a pig in a poke?

But this is just the tip of what could easily become a massive financial iceberg. The airport site has been under new ownership for approaching 3 years. Clearly the owners, like all businesses, want to see a return on their investment. However the seemingly endless efforts of TDC politicians to secure a CPO could be argued to have blighted the development of, and investment in, the former airport site. If the CPO process continues for very much longer then, I would guess, that the owners may quite rightly conclude that they are the victims of a politically motivated abuse of power. This could possibly lead to court action against the Council with the owners seeking compensation for lost income. Bearing in mind the scale of the proposed Stone Hill Park development, compensation could quite easily exceed the £4.2 million already paid out by TDC to the cruel and barbaric live animal exporters or the £3-4million compensation and fines which are expected to be imposed on Thanet Council later this year when it is sued and prosecuted for the “vibration white finger” scandal in which TDC unlawfully failed to protect the health and safety of 20 or so of its staff. I reckon that to wilfully blight, through an abusive use of the CPO process, a development as large as Stone Hill Park could easily cost £10miilion in compensation which would have to be picked up by the council tax payer.

On the basis of finance alone, it was clearly wrong of TDCs Labour councillors to have backed UKIP and the Conservatives in their extremely risky decision to continue with the CPO which is very likely to cost local people a small fortune. Considering the massive overspends and loses incurred when Labour ran Thanet Council such as Live Exports, Dreamland and the TransEuropa Ferries disaster, which undoubtedly cost Labour many council seats, I would have thought its councillors would have become more financially prudent. Clearly I misjudged their capacity to learn from their mistakes, demonstrated by their support for an extremely risk CPO, which might cost residents dearly.

The next issue is jobs and the economy. There is absolutely no doubt in my mind that a successful mixed use development at Manston would create many more jobs than a re-opened airport. It would also attract massive inward investment into Thanet from the organisations which located to, and helped to construct, the site. In an area blighted with rates of unemployment well above the national average; the lowest wage rates in south east England; appallingly poor levels of educational attainment and some of the highest rates of deprivation and poverty in the country, a regeneration project such as that proposed by Stone Hill Park is a once in a generation opportunity which should be eagerly grasped with both hands.

By supporting UKIP and the Tories in their search for a CPO  partner, TDCs 5 Labour councillors have turned their backs on the future, supporting instead an action which will frustrate, blight, delay and undermine the massive regenerative potential of a development plan for the airport site which could be a key driver in kick starting Thanet's troubled economy. Furthermore, I can't understand why a party which is allegedly committed to tackling unemployment, poverty and deprivation allows 5 of its councillors to support plans which will undoubtedly make these problems much worse instead of better. I thought the reason why Jeremy Corbyn had been elected Leader was to transform the Labour Party into a rejuvenated socialist force which challenged poverty and deprivation. Clearly TDCs Labour councillors have not been listening to their national leader.

Last but not least the environment. Airport's are renowned as being a major cause of noise and atmospheric pollution. Considerable care, attention and cost is now invested in planning strategic aviation needs so as to protect the environment. As part of the recent strategic review of airport capacity, chaired by Howard Davies, it was concluded that Manston had no significant role to play in the future aviation needs of south east England. So why should Thanet's 5 Labour councillors lend their support to saving an airport which will not only pollute the district, but which has also been adjudged by industry experts as being superfluous to future capacity requirements. This is just plain stupid. But sadly hardly surprising. Under the leadership of Clive Hart and Iris Johnston, Thanet Labour councillors have actively despoiled Thanet's environment; approving plans for 750 houses on farmland at the New Haine Road; supporting the unnecessary and damaging Parkway Station at Cliffsend and their development of a Local Plan which locates 60% of their projected 12,500 new houses (now increased to 15,600) on greenfield sites. Supporting the compulsory purchase of Manston airport is a continuation of Thanet Labour councillors long and appalling record of environmental vandalism, which once again starkly contrasts with Jeremy Corbyn's insistence that Labour focus on promoting the green agenda.

In summary Thanet Council Labour Group Leader, Iris Johnston, and her four Labour councillor colleagues by supporting UKIP and the Conservatives on the Manston CPO have agreed to support a policy which has potentially disastrous financial consequences; a policy which will blight, undermine and delay the economic development of Thanet and a policy which threatens to cause considerable environmental damage to Thanet. What the “gang of five” have achieved is to support a policy which runs contrary to fundamental Labour Party values. An action I would argue brings the Labour Party into disrepute.

So how did the Labour Party get itself into this embarrassing position? Easy pure electoral opportunism. Seeing the growth of what was then a powerful campaign to save Manston Airport, Labour (Like UKIP and the Tory's) cynically jumped on the bandwagon in order to secure votes in the 2015 election. Even I was guilty of being mesmerized by the power of the extremely well organised Save Manston campaign and supported the CPO until I had properly thought the issues through. Thankfully some people in Labour have also, albeit belatedly, been thinking about the Manston issue and the South Thanet Labour Party voted at the end of the 2015 to back a policy supporting a mixed use development on the former airport site.

But even though this policy was agreed in 2015 the South Thanet Labour Party decided not to mention in it in any of its its election literature during the recent Newington by-election. I wonder why? And why despite having a policy supporting a mixed use development at Manston, did councillors Campbell, Matteface, Fenner and Constantine who are all South Thanet Party Labour members, fail to stop Labour Leader Iris Johnston from putting forward a pro-CPO policy at the Council meeting last week, when this was clearly against the wishes of a majority of their South Thanet party colleagues? If I was a member of the South Thanet Labour Party I would be furious and would be demanding that a statement be immediately issued distancing the party from rogue councillor Iris Johnston. I would also be actively campaigning for her removal as TDC Labour Group Leader. I touched on these questions in my previous blog and produced evidence to demonstrate that people in the Labour Party were indeed extremely angry with Johnston for supporting the Manston CPO. I was promptly removed from the No Night Flights Facebook page for raising these serious issues of political accountability without the opportunity to explain my actions and even though the No Night Flights groups is allegedly “non-party political”.

I believe that in typical Labour Party fashion the deep and acrimonious internal divisions about Manston Airport are being covered up and suppressed to create a misleading public impression Labour is united on the airport when clearly it is not. This is why its election leaflets did not mention Manston Airport, this is why Iris Johnston and her “gang of four” supported UKIP and the Tories on the CPO partner. This is why an allegedly non-political facebook, page, which in reality is controlled by prominent Labour Party supporters booted me out without warning and without an opportunity to explain myself for exposing the splits and disagreements within Thanet Labour about the airport.

I thought Labour under Jeremy Corbyn was all about “new politics” which is tolerant of debate a differences. Not in Thanet where Labour remains firmly North Korean in its suppression of dissent and stupidly tribal in its approach to other progressive, anti-austerity political organisations

Saturday, 27 February 2016

Thanet Labour: Aeronautic Stunts

At the Council meeting on 24th February Thanet Labour Group Leader Iris Johnston made it clear that  Thanet’s 5 Labour councillors are still supporting the re-opening of Manston Airport. Responding on behalf of the 5 Labour councillors to comments made  by Council Leader, Chris Wells, about a market testing exercise to recruit  a new business partner to work with TDC to secure a Manston CPO, Johnston said “I do feel that you are doing the right thing by trying to find somebody (to save the airport). You can’t get much clearer than that!  –  according to their group Leader Thanet's 5 labour councillors agree that UKIP and the Tories “are doing the right thing” in trying to find a partner who might help to re-open Manston Airport.

But hang about a minute, I understand that the South Thanet Labour Party, which covers the Ramsgate area,  voted several weeks ago to oppose the re-opening of Manston Airport;  supporting instead its redevelopment into a mixed use residential, leisure and commercial site. Whilst I agree 100% with this sensible decision  I  wonder why Johnston was able to stand up at  last weeks Council meeting and espouse a policy which directly opposed the agreed position of her South Thanet comrades? Surely she must have known what her comrades decided a couple of months ago?

What confuses me even more is that three out of the five Thanet Labour councillors (Constantine, Fenner and Campbell) represent South Thanet wards and are all members of the South Thanet  Labour Party. Why on earth didn’t they use their majority position to overrule Johnston and prevent her from putting forward a policy which conflicts with South Thanet Labour Party? Perhaps they also disagree with South Thanet Labour Party about the airport? Perhaps they don’t see the airport as an important issue?  Perhaps they are scared of their Leader? Or perhaps they were simply asleep at the wheel like most other councillors tend to be?

Either way the failure of the 3 South Thanet Labour councillors to stop Johnston from committing them to a pro-airport policy is a disaster. The Council, which is already in a very difficult financial position will now have to spend massive amounts of public money continuing the pursuit of an expensive  CPO which everyone knows is bound to fail. Plans to re-develop the site, create desperately needed jobs and attract major investment into Thanet will be delayed yet again due to the negative messages being sent out by the Council. Surely this was a major opportunity for Labour to have stood up against the futile CPO charade and made it clear it was on the side of  regeneration and progress, rather than clinging to its discredited past.
And I’m not the only one who sees things this way.  I re-produce an extract from a facebook page about Manston Airport  which gives a taster about just how angry some Labour Party members are with Iris Johnston. I reckon her days as Party Leader are numbered and that fairly soon she will be  pushed , if she  doesn’t jump first. This reminds me of  Johnston’s predecessor,former Labour  Council Leader Clive Hart, who despite the fact that the Labour Party  in Thanet stood for election on a policy of protecting our green field sites from development, agreed in his capacity as a member of the East Kent Opportunities (EKO) management board to build 750 houses on  a farmland next the New Haine Road.  So,  yet again history repeats itself. Despite election promises to protect Thanet’s  environment successive Labour leaders have supported actions which despoil our green fields and increase atmospheric pollution. I hope that  those Labour members who are undoubtedly plotting Johnston’s political demise  act quickly and without mercy. Her utterances at last weeks Council meeting have let you down badly.  


Tuesday, 2 February 2016

Thanet Council's Historic Fairground Rides Vandalism.

Vintage fairground rides, destined for the Margate Dreamland Amusement Park,  which were purchased using  government grants, have been “left to rot” at  Ramsgate Port says former Green Party councillor Ian Driver.

The rides including  a Corbiere Wheel;   a Junior Whip;  and an American Whip have been stored outside, without cover or protection,  for  a year and have become badly damaged by continual exposure to the elements.

Said Driver “these rides are of great historic importance, some of them are over 70 years old and are amongst a  tiny handful of surviving examples.  The Heritage Lottery Fund  allocated £1.235 million to restore  these, and other rides,  to their former glory for the public to use and enjoy at  Dreamland. But sadly they have been dumped at the port of
Ramsgate forgotten about and allowed to rot and deteriorate. It’s probably too late to restore them now as they have become so badly damaged. This is an insensitive act of historic vandalism by Thanet Council and the latest in a series incompetent blunders  by senior TDC officers responsible for managing the Dreamland project".
Its is understood that in order to make space for the car importation contract at Ramsgate Port, the rides will shortly be moved to another Thanet location where, once again, these valuable  historical rides will be left outside unprotected from the elements. Thankfully I was able to take a few photographs of the rides and their sorry state.

Monday, 25 January 2016

Dreamland Risk Warning Supressed by Thanet Council??

Former Green Party councillor, Ian Driver, has accused senior Thanet District Council (TDC) bosses of supressing warnings about the  “considerable risks” associated with the prestigious Margate Dreamland Amusement Park. In a report dated 5 February 2015, which was commissioned by TDC at the cost of £5,500(1),  GVA Grimely, one of the country’s largest commercial  property advisers,  warned the council  that “there is considerable risk associated with the viability of a scheme of this nature  particularly in a secondary/ tertiary coastal location”(2).

The report describes the Dreamland scheme as having a “substantial risk profile” and being “extremely speculative”. A  SWOT analysis  of the project, carried out by GVA Grimely  identifies “that the risk  outweighs  the benefits”. The risks identified by GVA Grimely include  –
·        Margate is not regarded as a key coastal destination
·        Highly speculative in location
·        Limited direct catchment not 360 degrees
·        High cost of the development
·        Need for annual investment to ensure product remains interesting and attractive
·        English Heritage / listed building constraints
·        Development of competition in and around more popular south east locations  with consideration of the substantial scheme planned at Swanscombe for example (£2 billion Paramount Theme Park)
·        Economy and weather
                                                                                         
Said Driver “TDC bosses appear  to have suppressed this important report and kept it secret from elected councillors. No mention of it was made by senior council officers and Council Leader Iris Johnston  at the cross-party members briefing on the Dreamland project held on 23 February 2015, at which I was present. No mention of it was made at the Council’s Governance & Audit Committee held on 17 March 2015 at which councillors reviewed TDCs Corporate Risk Register. In fact, at that meeting councillors  were advised that the risk of Dreamland project failing   “would  reduce significantly” to a medium to low classification   because Sands Heritage had recently been appointed as the Dreamland park operator”(3).

“What has happened here is  utterly astounding” added  Driver, “Top council bosses and, I believe, certain members of the Council’s ruling Labour Cabinet,  were in possession of, or knew about,  a report from a large reputable firm of commercial property advisers  warning of the high risk of  the Dreamland project failing. Instead of acting on the warnings and working to develop contingency plans to secure the project, the report was withheld  from councillors. At least £6 million of council taxpayers money had been invested in Dreamland by TDC, democratically elected councillors have a right to know if this investment is at risk, but they were kept in the dark by  the officer and political leadership at the council. This is plain wrong”
“I have always been a big fan of Dreamland. It’s vitally important to Thanet’s economy. But is becoming  increasing clear now that top bosses at Thanet Council and the Council’s then Labour leadership have badly mismanaged  the Dreamland project. They massively overspent  taxpayers money on developing the project; misused Heritage Lottery funding (HLF); failed to  keep the  HLF properly informed about project progress and the appointment of Sands Heritage (SH) as the park operator; delivered the  flagship scenic  railway  months late causing hardship for SH; had to pay SH about £1million in compensation for handing over an amusement park not fit  for purpose.  Now it has emerged that top council bosses and, I believe, some Labour Cabinet members, withheld  warnings that the project had a high risk of failure and appear to have misled councillors responsible for reviewing TDCs risk register about the level  risk faced by Dreamland”
“With incompetence, maladministration and cover-ups of this magnitude, is it any wonder that the Dreamland operator came close to bankruptcy and the future of the attraction remains in the balance?  At least £6million of council taxpayers money has been invested by TDC in opening Dreamland – that’s £45 for every man, women and child.    I think there should be a full independent enquiry into TDCs management of the Dreamland project which will, I hope,  lead to  the resignation or dismissal of those senior officers and politicians identified  as being responsible for this monumental and expensive disaster. The council should, as a matter of the greatest urgency,  also be developing a Plan B to identify and reduce further   risks to this project  and secure the future of Dreamland before its too late”.

Sunday, 24 January 2016

Thanet Council’s Freedom of Information Shenanigans

2015 marked the 10th anniversary of the introduction of the Freedom of Information Act. Heralded as a major extension of democracy, the Act has enabled members of the public and journalists to hold to account public bodies such as government departments, local councils, schools, the NHS, the Police and the managers and politicians who run these organisations.

In its 10 years of operation the Act has been used to expose countless instances of injustice, maladministration and  downright criminality the most notable  being the  MPs expenses scandal. Had it not been for the  FOI  Act we would never have known about how hundreds of MPs were maxing out their expenses and allowances to top up their already generous salaries and pensions in a state funded  orgy of naked greed. Thankfully once exposed their reputations were deservedly trashed. Many of these grasping carpet baggers were removed from the Lords or Commons and some, but not enough, were imprisoned for taking a ride too far on the Westminster gravy-train. Yet instead of celebrating the 10th anniversary of the FOI Act and proudly proclaiming its effectiveness in holding public intuitions and politicians to account, the Government instead unveiled plans to weaken this important democratic tool.

In the autumn of 2015 it set up the Independent Commission on Freedom of Information to review the workings of the FOI Act. Members of the Commission include several people who have made criticism of the FOI Act and who appear to be unfriendly towards the democratic principles of freedom of information. The consultation exercise being carried out by the Commission also appears to be skewed in favour of undermining the effectiveness of the FOI Act.  Amongst other things, the Commission is canvassing opinion on whether to charge fees for making FOI requests and appeals, whether to exempt  internal  briefings and discussions of public bodies from the Act altogether, and whether to allow public bodies to impose much lower cost/ hours  thresholds for rejecting FOI requests.

Sadly, Thanet Council is one of those organisations which has joined in the anti-democratic hullabaloo to undermine and weaken the  FOI Act. In a response to the Commission’s call for evidence, TDC has shamefully proposed the introduction of a £25 charge for each FOI request made to the Council. It has also proposed the  tightening up of the hours and cost rule to enable the rejection of a large number of  FOI requests, and changing the rules to make  it easier to reject what TDC judges to be spurious/ vexatious FOI requests. You can see TDCs submission here https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/487269/Responses_R_-_Z.pdf

I accept that processing FOI requests is time consuming and costly. I also accept that TDC receives its share of vexatious/ spurious FOIs. However the overwhelming majority of FOI requests are reasonable and legitimate. Some FOI requests also serve the extremely important democratic purpose of exposing the incompetence of TDC’s politicians and senior officers, breaking down their culture of secrecy and holding them to account.  For example, the  FOIs I have submitted on Pleasurama, TransEuropa Ferries and the East Kent Opportunities development at the New Haine Road   revealed extensive mismanagement,  cover-ups, abuse of power and bad practice  which former Labour Leaders and top council officers would have preferred to have remained hidden from public view. Indeed former Labour Leader Clive Hart actually cited my use of FOI requests as one of the reasons why he resigned  as Council Leader in 2014 (see http://thanetgreencouncillor.blogspot.co.uk/2014/05/ian-driver-statement-re-clive-harts.html )
Most  recently an FOI request from Margate-based campaigner, Louise Oldfield,  has revealed serious mismanagement of the troubled Margate Dreamland Amusement Park project. It’s no exaggeration to say that our FOI laws are a vital component of a modern democracy and should actually be strengthened and extended rather than weakened and restricted as TDC has argued in its submission to the Commission. 

I must confess to being confused as to why TDC has become so hostile towards FOI requests. Its own Constitution makes 18 separate commitments to being open, transparent  and accountable to the people of Thanet. TDCs own Independent Standards Advisers also suggested  that one of the ways of restoring the council’s tarnished reputation and rebuilding confidence in its politicians was “for citizens to be able to access information held by the Council they have elected”. Yet TDC bosses appear,  on the basis of their submission to the FOI Commission, to be hell bent on reducing and limiting openness and transparency and making it even more difficult, especially for those on low income, to get information from their council.

It would also appear that efforts have been made by TDC to exclude elected councillors from having any involvement in formulating its response to the FOI Commission. The Commission invited all UK public bodies to comment on the operation of FOI laws on 9th October 2015. The consultation deadline was 20th November 2015. I have checked the minutes of all TDC meetings between these dates and can find no reference to councillors being asked for their views on this important consultation. I can only assume therefore that important recommendations about the public’s right of access to TDCs  information have been decided in secret, presumably by a small cabal of top officers and cabinet members, who may have vested interests in avoiding public scrutiny.  This is simply unacceptable and undemocratic – all councillors should have had the opportunity to express their views on this very important matter.

But most mysterious of all, I was surprised by the fact that TDCs submission to the Commission appears to have been at odds with what I understand to be its ruling party’s (UKIP)  policy on FOI. According to what I have been able to find out “UKIP supports the right for the British people to find out more from government about how decisions are made, information the government keeps on government business and where the government spends our money. The Freedom of Information Act is an invaluable tool to empower the British people”. (link http://www.confirmordeny.org.uk/?p=117 ) UKIP MP Douglas Carswell also had published in the Daily Mail in July 2015 a long article supporting the FOI Act and opposing efforts by the government and  the Freedom of Information Commission to weaken and undermine it (link  http://www.dailymail.co.uk/debate/article-3166828/This-law-allowed-expose-dodgy-MPs-paedophiles-nuclear-risk-RAF-air-raids-scroungers-s-no-wonder-Tories-want-ban-Freedom-Information-writes-DOUGLAS-CARSWELL-MP.html)

It seems strange to me that a UKIP controlled council would support a submission to the FOI Commission which is at odds with UKIPs  policy on this important matter. Unless of course UKIP policy has changed;  Thanet UKIP councilors are unaware of their party’s policy on this matter; or more worryingly  the submission to the Commission was prepared and submitted by officers without the knowledge and approval of TDCs ruling political group. If the latter is the case then the Leader of the Council has no option but to contact the Commission and withdraw the submission and speak to the officers concerned. I have written to TDCs Leader Chris Wells and Deputy Leader Lin Fairbrass to see if they can throw any light on this matter.

Although this is a long and complex posting surely the bottom line must be that all public bodies must be accountable to the people they work for, especially a public body like Thanet Council which has long history of corruption, incompetence, secrecy, and maladministration. Yet here we have  the appalling spectacle of  what most surely be one of the most disreputable councils in the UK lobbying  the FOI Commission for permission to become even less accountable, transparent and open than it  now is. The people who drafted this submission, have learnt nothing from recent events. They  should be utterly ashamed of themselves. And those politicians who approved this submission  should step aside for those with a stronger commitment to democracy

Saturday, 23 January 2016

Thanet Council White Finger Scandal To Cost You £4 Million?

Reports that Thanet Council has set aside £2.5million to pay compensation claims for over  20 serving and former council staff, who contracted the debilitating Hand, Arm, Vibration Syndrome (HAVS) whilst working for TDC got me wondering about the costs TDC appears to have neglected. These are the costs associated with any prosecution which may be taken against TDC by the Health and Safety Executive (HSE) or any other interested party.

My understanding is that the HSE will, following an extensive investigation, almost certainly be prosecuting TDC for breaching safety laws and damaging the health of a large group of its workers to whom it owes a legal duty of care. I am led to believe that the prosecution will take place later this year.   Any prosecution which takes place after 1 February 2016 will be conducted under new sentencing guidelines.

The new sentencing guidelines are very tough, and so they should be if employers through their actions or omissions, harm the health of their workers.  For the worst breaches of safety laws employers who recklessly and knowingly breach health and safety laws causing the death of staff or members the public now face an unlimited fine. Clearly Thanet does not fall into this category. However, it is likely that evidence may have been discovered which demonstrates that TDC had ignored safety laws and may have even falsified safety monitoring records. These reckless actions, if proved to be true, have led to a large number of staff contracting HAVS. Under the new sentencing guidelines this means that TDC could face a very large fine, perhaps up to  £1 million or more. When adding in the legal costs of defending a case as complex as this the final bill could easily reach £1.5 million, bringing the total bill for the  HAVs scandal to somewhere in the region of £4 million. That’s an astonishing £29 for every man, women and child living in Thanet. Also bear in mind that Thanet Council’s insurance policies are unlikely to cover a penny of £4 million costs because it’s likely that a court will decide that HAVs were caused by the unlawful actions of TDC and unlawful actions are never covered by insurance policies.

The other issue which interests me is that the HSE can, and often does, prosecute managers (serving or former)   where there is evidence of individual culpability in breaking safety laws and causing death or injury to staff. Not that I am aware that such evidence has been uncovered by the HSE in relation to this incident. However working on the hypothetical assumption that managers knowingly and recklessly breached health and safety laws causing 20 plus staff to contract “a progressive, permanent or irreversible condition” then those individual managers could face between 6 months to 2 years imprisonment and/ or an unlimited fine.

Clearly what I have written here is speculation on my part, but what I do know and what I have written about previously, is that the HAVs scandal at Thanet Council is not a small, insignificant incident, but something much more serious and widespread, with significant health implications for the  20 plus staff  affected. If there have been any failings, if there has been any wrongdoing then the council and those individuals responsible must be held to account and prosecuted, rather than covered up and protected as is normally the case at Thanet Council.

 

Friday, 15 January 2016

Newington By-Election. Why I'm Standing

Here are a couple of short (by my standards!) videos about why I am standing as a candidate in the Newington by election. The big issues are an incompetent council and incompetent political leadership of the council,  and regeneration, jobs and training. These videos deal with the subjects. Hope they are of interest and don't put you to sleep.




 
promoted and published by Ian Driver 45 Sea View Rd CT101BX on behalf of Ian Driver and Andrew Jefferson Green Party candidates in the Newington by-election.